Jan. 25th, 2005

womzilla: (Default)
And other times, it takes a little more work to connect the dots.

As people here have noted, yesterday evening there was a fire in a control room at the Chambers Street station on the 8th Avenue Subway line in lower Manhattan. Because of this fire, the local train--the C--will not be able to run for an undetermined period; the estimates are two to five years, though I have a gut feeling that it will be less than the lower bound of that estimate. This is not a crippling blow to New York's infrastructure, but it is a significant one; the Blue Line (as New Yorks do not call it) is the third-busiest group of trains in the MTA, carrying several hundred thousand passengers a day, and this fire has effectively wiped out express service along a route which runs nearly the entire length of Manhattan.

It has transpired that the fire was set by a homeless person trying to stay warm.

So while everyone was expecting a second massive terrorist attack, the biggest infrastructure damage it has suffered since September 11th was caused because New York doesn't manage to provide basic life services to its neediest.

Way to set priorities! Thanks for the clue-stick, world.

Profile

womzilla: (Default)
womzilla

March 2016

S M T W T F S
  12345
6789101112
13141516171819
202122232425 26
2728293031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 8th, 2026 03:21 pm
Powered by Dreamwidth Studios